Armature Winder (LV/MV/Senior HV) – Roodepoort
MECS Pty Ltd · Roodepoort, Gauteng
Stop applying one at a time.
JobAlertsZA auto-applies to South African jobs like this one for you, overnight. Upload your CV once — we do the applying.
Start free — we apply for you →- Wind the machine so it matches the approved data.
- The winder records what came out, builds what must go back in, presents the job at every hold point, and does not impregnate or close a winding that is wrong.
- This is a trade, used on whatever motor work is taken in — power station, mine, rail, water or industrial.
- Grades LV Winder · MV Winder · Senior / HV Winder
Reports to Production Manager
- Technical hold points Quality Manager and Engineering Manager, as marked on the QCP
- Scope AC and DC rotating machines across all sectors and clients.
- Employment Permanent, full time.
- Overtime and breakdown cover.
Minimum requirements
- Trade tested Electrician or Armature Winder, or a documented equivalent recognised in South Africa.
- Grade experience as in the table above. MV and HV grades will be tested on form-wound data and a sample winding sheet at interview.
- Able to read a connection diagram and work to a QCP without being walked through every step.
- Medically fit for workshop work, crane-supported cores and oven / VPI heat. Prepared to work overtime on breakdowns.
- Both AC form-wound and DC armature / commutator in the same person Senior / HV.
- Utility, mining or heavy-industrial contract motors. Ability to train a junior without lowering the standard.
Grades
- Grade Typical machines Bar for appointment
- LV Winder Low-voltage AC and light DC; mush / random wound Trade test plus 3 years productive rewind
- MV Winder Medium-voltage form-wound; industrial and utility motors 5 years including MV form-wound and VPI
- Senior / HV Winder HV form-wound, large AC, complex DC armatures 7+ years; leads data, coaches others, stands as client witness.
Accountabilities — all grades
- Record winding data before strip: turns, wire, pitch, grouping, connection, insulation, leads, RTDs / thermistors / surge rings.
- Photograph failed windings. Do not destroy evidence the client still needs.
- Strip only by the approved method. No cutting torch. Heat only within the written oven limit.
- Present the core for flux / EL-CID. Do not rewind a core that has not been cleared.
- Manufacture coils to the original design unless Engineering has approved a change in writing.
- Joints brazed or welded. Insulation class and system as specified, Class H as the normal workshop minimum unless the job says otherwise.
- Present stator / rotor / armature for Quality and client witness before VPI. That hold is not optional.
- Prepare for VPI, terminate and mark leads, and support IR, PI, surge, HV and no-load tests on the winder's work.
- DC work to grade: armature, interpoles, field coils, commutator undercut / mica / bar-to-bar. Flag a commutator that should be replaced.
- Sign the stage you did, when you did it. Expired resin or the wrong wire is not used to keep a job moving.
Authority
- Refuse to wind a core that has not passed flux / EL-CID, or a job with no approved data / QCP.
- Stop and call Production, Quality or Engineering if the material or the hold point does not match the motor.